Scope of Work
Supply, installation and commissioning of complete ITS system project, including system platform, controller, traffic detector and communication system
Forward-Mounted Microwave Radar Traffic Flow Detector 332 Set
Video Traffic Flow Detector 14 Set
Existing Traffic Signal Controller Main Control Board,
Detection Board Upgrade 41 Unit
Traffic Signal Controller Replacement 50 Unit
Wireless Transmission Equipment 189 Set
Aggregation Switch 51 Unit
Fiber Optic Transceiver 178 Pair
Multi-Source Traffic Information Perception Intelligent
Control System 1 Swt